O
Jeffersontown
← Jeffersontown

Jeffersontown · issues

Civic issues

Topics getting the most attention in Jeffersontown public meetings, ranked by how frequently they come up.

5 issues (filtered)9 topics
HighWater Utilities

Collapsed drainage pipe flooding two homes

Public Works needs legal clearance to remove a fence built over an easement pipe that has collapsed and flooded two neighboring houses; the work is a priority.

1 mentionLast discussed Oct 6, 2026
HighWater Utilities

T-Mobile fiber contractor damage and oversight

A resident reported cracked brickwork, a cut AT&T line, a ruptured gas line, and blocked mailboxes from T-Mobile's fiber installation crews. Public Works responds by holding permits block-by-block and refusing new permits until damage is fixed. Spectrum fiber work is expected in the area within months.

2 mentionsLast discussed Sep 15, 2026
LowWater Utilities

Splash Park Water Bill Mystery

The splash park's water bills spiked, but no leak is showing at the meter. Staff thinks an old $60,000 bill credit expired, and will monitor usage over the next year.

1 mentionLast discussed Aug 18, 2026
HighWater Utilities

Stormwater drainage and flooding on Bluebird Lane and Grand Avenue

Public Works reported Grand Avenue has flooded repeatedly this year and stormwater models date to 2001. The developer proposed 50% extra detention and swale improvements, but residents downhill worried about runoff and aging sewer pipes.

1 mentionLast discussed Jul 22, 2026
HighWater Utilities

Flooding and Stormwater Along Chenoweth Run

Residents say what used to be rare floods now hit several times a year, blaming upstream development and MSD's practice of letting developers pay fees instead of building on-site retention. City officials say J-Town mandates detention for its own projects but has no control over the Corps of Engineers floodplain or Metro's fee-in-lieu practice.

2 mentionsLast discussed Jul 7, 2026